Skip to content

Milestones

List view

  • Refactor the thcrap directory. Instead of shoving everything in the top-level directory, we put things in subdirectories and keep the top-level one with only things the user want to see. See #100

    No due date
    5/6 issues closed
  • Bug fixes and features that will be completed before the move to GCC becomes the main thing @Nmlgc works on.

    Overdue by 8 year(s)
    Due by November 30, 2016
    0/2 issues closed
  • What needs to be done before 2.0 can be released.

    No due date
    2/10 issues closed