Meta station engi hv mapping is missing wires. #34344
Labels
A: Mapping
Area: Maps, or tools used for mapping
DB: Beginner Friendly
Difficulty: Great for beginners. Unambiguous in scope, and explains how to achieve the result.
P3: Standard
Priority: Default priority for repository items.
T: Bugfix
Type: Bugs and/or bugfixes
Description
There is no HV connecting the sides of rad collectors together. Only the south array of collectors is connected to the grid. The north array runs off to connect to gravity and north east solars but has no connection to the SMES bank. The substation powering engineering also has no connection to the load side of the SMES bank for the singulo/ame. This means that if the TEG is running and no other power sources are active, engineering power will eventually die out.
Amending another issue to this post.
In the science arti room, theres two manual valves hooked up to distro into the arti chambers. These should probably have passive gates behind them as it enables accidental plasma leakage into distro.
Reproduction
Load up Meta station.
Examine the HV routing beneath the floor.
Screenshots
Edit: View the amendment.
The text was updated successfully, but these errors were encountered: