Skip to content
This repository has been archived by the owner on Jul 23, 2020. It is now read-only.

Sprint 143 Planning: Fabric8 Analytics #1738

Closed
22 of 24 tasks
sivaavkd opened this issue Jan 2, 2018 · 11 comments
Closed
22 of 24 tasks

Sprint 143 Planning: Fabric8 Analytics #1738

sivaavkd opened this issue Jan 2, 2018 · 11 comments

Comments

@sivaavkd
Copy link
Collaborator

sivaavkd commented Jan 2, 2018

OSIO Analytics Sprint 143

Sprint Goals

Publishing IDE extensions for OSIO analytics platform (VSCode, DevStudio)

Analytics recommendations for Vert.x and SpringBoot and quick-starters

Testing / Quality related

Getting started experience

CVEs

Improve license recommendation for end user

Bugs

Feedback Loop

Stretch goals (POCs, pulled in from H train priorities)

Engineering work

Work on high priority Technical Debt

@krishnapaparaju
Copy link
Collaborator

@sunilk747 Please include the License related EPIC (next steps) as part of the sprint plan

@krishnapaparaju
Copy link
Collaborator

@miteshvp Please include PGM caching related work item

@krishnapaparaju
Copy link
Collaborator

@invincibleJai Please include work items related to quick POCs around (a) Insights at Che (b) Flagging CVEs, Stack level Licenses at build, pipelines screens. Goal is to iterate a quick POC and get it reviewed with PM team.

@krishnapaparaju
Copy link
Collaborator

@rootAvish @abs51295 Please include spikes around research around analytics: (a) based on Bayesian networks with Edward to have Bayesian networks run on deep neural networks (b) Plain deep neural networks

@krishnapaparaju
Copy link
Collaborator

@samuzzal-choudhury we wanna wrap up fixing performance bottlenecks by end of sprint # 143. Please change #1144 / create a new issue and include as part of the sprint plan.

@krishnapaparaju
Copy link
Collaborator

@miteshvp Please include the issue covering remaining work items related to insights for VertX and SpringBoot ecosystems.

@krishnapaparaju
Copy link
Collaborator

@sivaavkd please remove #1521

@krishnapaparaju
Copy link
Collaborator

Please remove code merge related work until UX work is done for this activity

@krishnapaparaju
Copy link
Collaborator

krishnapaparaju commented Jan 3, 2018

@sivaavkd From this sprint, please remove integrating into Che files as currently OSIO support Che version 5x and this Che files format related work is being planned for Che version 6x.

@bmicklea
Copy link
Collaborator

bmicklea commented Jan 8, 2018

This is a very aggressive sprint - perhaps we should start listing priorities in the description here? From my perspective the most important things are:
#1773
#1144
#1264
#1767
#1761
#1695
#1693
#1329

@krishnapaparaju
Copy link
Collaborator

@bmicklea Ack. Doing well with these work items marked as priority. I have included an new icon to indicate priority and maybe would be good to review during spring demos..

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.