Skip to content

Latest commit

 

History

History
15 lines (14 loc) · 617 Bytes

68-PA-T-153A.md

File metadata and controls

15 lines (14 loc) · 617 Bytes
layout date from serial subject
tindallgram
Jul 9 1968
PA/Chief, Apollo Data Priority Coordination
68-PA-T-153A
Good news on "C" mission SPS burns

The following is a verbatim copy of a note to me from Rick Nobles (MPAD). I thought it was worth distributing.

"The cross axis velocity errors resulting from SPS mistrim (CSM alone) will be about one half of what was previously anticipated. The reduction in error is due to the new DAP filter constants that the G&CD is recommending for the "C" mission erasable load. The only adverse effect is the mission planning that has been done to date."