Carrying out sampling/reclamations |
Coordination of the sampling dates with the global Quality Planner between inter company customer and production |
Creation of initial sample inspection reports for blow molding parts |
Processing of pre-series complaints |
Monitoring the processing of corrective measures |
Transfer of root causes and measures from complaints to the FMEA |
Inspection planning - development of gage concepts for the inspection of Blow molding parts in the different production steps |
Collaboration in the definition of part-related gauge layouts |
Creation and maintenance of test instructions |
Creation of the pre-series control plan, the series control plan as well as production flow chart |
Determination and evaluation of quality-relevant customer requirements within the feasability Study and process FMEA |
Checking the drawings for compliance with internal specifications as well as quality-relevant topics |
Documentation of deviations or requirements during the manufacturability process |
Coordination and moderation of the FMEA meetings |
Participation in FMEA meetings |
Carrying out risk analysis |
Participation in internal process series as well as in customer acceptance tests |
Coordination/scheduling of customer appointments with global Quality Planner and internal Stakeholders |
Effectiveness check of the Poka Yoke measures |
Checking of product and process-related documents for correctness |
Checking of product and process-related documents for correctness and completeness - Initiation and supervision of process capability studies |
Enforcement of the principle of autonomous monitoring at every production site. |
Specification, instruction and monitoring of compliance with workplace and inspection documentation. |
Introduction of continuous improvement actions with the aim of reducing quality costs |
Clear identification, labelling and tracing of products as well as control according to "FIFO" |
Ensuring the process capability of the product-relevant machines and systems |
AS/WS/UWS within the framework of the activities |