Skip to content

Modernize Build System and CI/CD with uv and PEP Standards #32

Modernize Build System and CI/CD with uv and PEP Standards

Modernize Build System and CI/CD with uv and PEP Standards #32

Re-run triggered March 26, 2026 17:25
Status Failure
Total duration 20s
Artifacts

test.yaml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

10 errors
build (3.10)
Process completed with exit code 1.
build (3.10)
Event loop is closed
build (3.10)
Event loop is closed
build (3.10)
Event loop is closed
build (3.13)
The strategy configuration was canceled because "build._3_10" failed
build (3.13)
Process completed with exit code 1.
build (3.12)
The strategy configuration was canceled because "build._3_10" failed
build (3.12)
Process completed with exit code 1.
build (3.11)
The strategy configuration was canceled because "build._3_10" failed
build (3.11)
Process completed with exit code 1.