Hello Developers and the Users of DSS,
I am working with several differentially methylated region (DMR) callers, including DSS. I am using the DSS v2.40 in order to maintain the consistency across on-going projects in the lab.
Presently I am calling the DMRs in non-CG context which cannot be collapsed and thus the loci (or sites) are high in number from both strands.
From couple of weeks, I am facing a problem while using the DSS v2.40 as follows:
DSS runs out of time even when I try to run the program in the HPC cluster with its highest resources (shown below) for the following code:
The 96hrs (maximum time period) at HPC cluster is less for DSS to finish the DMRcalling step by DSS. Further, I extracted the samples into fractions such as chromosomes 1-6. But still my program cannot complete the "computing test statistic" function. It gives the following text as an output:
Smoothing ...
Estimating dispersion for each CpG site, this will take a while ...
|======================================================================| 100%
|======================================================================| 100%
Computing test statistics ...
slurmstepd: error: *** JOB 17623606 ON hpc-n547 CANCELLED AT 2024-11-20T13:40:35 DUE TO TIME LIMIT ***
Previously even when I used chromosomes 1-2 or 1-3 (without using the BPPARAM argument in the DMLTest), I faced the same issue.
Is this expected or there is some crucial parameter that I am missing out?
Did anyone faced this issue earlier?
I will be really grateful if anyone of you provide me your feedback over this issue.
Looking forward to hearing from you.
Have a nice day.
The text was updated successfully, but these errors were encountered:
Hello Developers and the Users of DSS,
I am working with several differentially methylated region (DMR) callers, including DSS. I am using the DSS v2.40 in order to maintain the consistency across on-going projects in the lab.
Presently I am calling the DMRs in non-CG context which cannot be collapsed and thus the loci (or sites) are high in number from both strands.
From couple of weeks, I am facing a problem while using the DSS v2.40 as follows:
DSS runs out of time even when I try to run the program in the HPC cluster with its highest resources (shown below) for the following code:
HPC resources used were:
Code for DMR-calling using the DSS:
The 96hrs (maximum time period) at HPC cluster is less for DSS to finish the DMRcalling step by DSS. Further, I extracted the samples into fractions such as chromosomes 1-6. But still my program cannot complete the "computing test statistic" function. It gives the following text as an output:
Previously even when I used chromosomes 1-2 or 1-3 (without using the BPPARAM argument in the DMLTest), I faced the same issue.
Is this expected or there is some crucial parameter that I am missing out?
Did anyone faced this issue earlier?
I will be really grateful if anyone of you provide me your feedback over this issue.
Looking forward to hearing from you.