Skip to content

*DO NOT MERGE* Doom hotfixes #6316

*DO NOT MERGE* Doom hotfixes

*DO NOT MERGE* Doom hotfixes #6316

Triggered via pull request November 21, 2024 16:18
Status Failure
Total duration 12m 54s
Artifacts 8

ci-nix.yaml

on: pull_request
Matrix: Benchmarks
Matrix: Build & test
Build haddock using nix
5m 32s
Build haddock using nix
Build specification using nix
1m 39s
Build specification using nix
nix flake check
10m 2s
nix flake check
Compute cost differences
6m 10s
Compute cost differences
Publish benchmark results
5s
Publish benchmark results
Publish test results
0s
Publish test results
Documentation
0s
Documentation
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Build & test (hydra-node)
Process completed with exit code 1.
Build & test (hydra-cluster)
The job was canceled because "hydra-node" failed.
Build & test (hydra-cluster)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
benchmarks-hydra-cluster-bench-e2e
738 Bytes
benchmarks-hydra-node-micro
96.8 KB
benchmarks-hydra-node-tx-cost
1.96 KB
haddocks
5.56 MB
hydra-spec
744 KB
test-results-hydra-plutus
986 Bytes
test-results-hydra-tui
1.42 KB
test-results-hydra-tx
3.69 KB