You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I think it's enough to call it out on the shear wall schedule. On second thought, maybe it's better to draw a scheme of the whole set: the shear wall, the truss and the concrete wall.
@lcpt,
Did you intend for the wall, circiled below, at the 2nd and 3rd floors, to be a shear wall?
There is no shear wall at that location on the 1st floor, because of the community room.
The text was updated successfully, but these errors were encountered: