Connect all dates fields to the correct ePO concepts #580
AchillesDougalis
started this conversation in
Alignment
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
-
We need to check all the dates fields from eforms SDK Explorer.
If there is just a date in an eforms field, we need to conect the corresponding ePO concept with a date.
If date and time in an eforms field is mandatory, then we have to make sure that the corresponding ePO concept is connected with both of them.
Check https://www.w3.org/2006/time#ProperInterval and
https://semiceu.github.io/CCCEV/releases/2.00/#Period%20of%20Time ontologies on how they are modeling time.
Beta Was this translation helpful? Give feedback.
All reactions