Skip to content

Changes

Changes #4

Triggered via push January 9, 2026 10:02
Status Failure
Total duration 16s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (3.13)
Process completed with exit code 1.
test (3.10)
Process completed with exit code 1.
test (3.11)
The strategy configuration was canceled because "test._3_10" failed
test (3.11)
Process completed with exit code 1.
test (3.12)
The strategy configuration was canceled because "test._3_10" failed
test (3.12)
The operation was canceled.