forked from UDST/bayarea_urbansim
-
Notifications
You must be signed in to change notification settings - Fork 11
PBA50scenarios
Michael Reilly edited this page Jun 2, 2020
·
9 revisions
- This is the "base" scenario in the sense that we are doing it first and the others build off of it
- Uses s21 control total files
- Uses s21 zoning modifications: major upzoning in all growth geogs
- Has almost all strategies in
- This is the "baseline" scenario in the sense that it doesn't have any pba50 change and so it also has far lower control totals
- Uses s20 control total files (these are minus the additional units built bc of housing policy in pba50)
- Uses s20 zoning modifications: these are minimal in that the do typical No Project treatment (UGB, upzoning within) but may also need UGB expansion to fit control totals
- Has no new strategies from PBA50
- This is the higher funding scenario
- Uses s22 control total files
- Uses s22 zoning modifications: same as s21
- Adds/modifies these strategies:
- adds incubator strategy
- This is the higher funding scenario with the New Transbay Crossing
- Uses s23 control total files
- Uses s23 zoning modifications: slightly higher upzoning than s21 and s22 at a few new/upgraded stations
- Same strategies as s22